drap-FR  drap-EN  drap-SPA

ACTIVITIES

Creating the artificial beach in Sipopo

1Customer: Somagec GE

Description:
Creating a 1500-metre-long artificial beach in hydraulic backfill
Quantity of hydraulic backfill put in place: 331,730 m³
Year started: 2010
Duration of works: 12 months
Idatco share: 24.49 %

 

 

 

AéropBata Airport:

2Customer: Somagec GE

Description:

Phase 1: extension of the platform for the runway layout (aircraft used as reference: A380)
Creating a 38-hectare platform to bring Bata airport up to standard and for the type approval of the runway for the A380
Quantity of hydraulic backfill put in place: 2,016,266 m³
Year started: 2011
Duration of works: 10 months
Idatco share: 45.75 %

 

3Phase 2: Adding 10 hectares to the platform for airport infrastructure facilities
Creating a 10 hectare platform for the airport infrastructure platform at Bata
Quantity of hydraulic backfill put in place: 255,496 m³
Year started: 2014
Duration of works: 2 months
Idatco share: 45.75 %

 

 

 

Port of Malabo

45Customer: Somagec GE

Description:
Construction of the port of Malabo
Backfilling of the bay from the port of Malabo
Quantity of hydraulic backfill put in place: 5,480,181 m³
Creating breakwaters in the port of Malabo
Quantity dredged: 400,000 m³
Year started: 2006
Idatco share: 15.61 %

 

 

Port of Bata

6Customer: Somagec GE

Description:
Construction of the extension of the port of Bata
Creating breakwaters in the port of Bata
Quantity dredged: 1,853,530 m³
Quantity of hydraulic backfill put in place: 2,728,104 m³
Year started: 2012
Duration: 42 months
Idatco share: 14.36%

 

 

Dredging of the channel at Corisco, Kogo, Aconeque and Port of Kogo and Aconeque

79corisco

Customer: Somagec SUD and Somagec GE

Description:
Construction of the ports of Kogo and Aconeque
Dredging the access channel between Corisco, Kogo and Aconeque to meet a water depth of -7 metres
Dredging the mud at the port of Kogo
Quantity dredged: 2,835,046 m³
Year started: 2013
Duration: 18 months
Idatco share: 27.33 %

 

 

Creating an artificial island at Corisco

8Customer: Somagec GE

Description:
Creating an artificial island at Corisco
Quantity of hydraulic backfill: 1,601,755 m³
Year started: 2013
Duration: 50 months
Idatco share: 22.54 %

 

 

 

Floating dock phase II & III

10Customer: Somagec GE

Description:
Construction of a ship repair yard
Backfilling of the floating dock platform phase II & III
Quantity of hydraulic backfill: 646,400 m³
Year started: 2014
Duration: 36 months
Idatco share: 12.47 %

 

Protection of Utonde beach

11Customer: Somagec GE

Description:
Construction of a protected breakwater on the Utonde beach tourist coast
Backfill for the protection of Utonde beach
Quantity of hydraulic backfill: 509,718 m³
Year started: 2015
Duration: 15 months
Idatco share: 26.66 %